Route of Kinder Morgan's Trans Mountain Pipeline.

Kinder Morgan unveils even bigger pipeline expansion

More than 300 oil tankers a year to load at Burnaby

Strong interest from shippers has convinced Kinder Morgan Canada to embark on an even bigger expansion of its Trans Mountain Pipeline through B.C. than previously suggested.

The line that crosses the Lower Mainland and sends oil for export on tankers through Burrard Inlet will be nearly tripled from 300,000 barrels per day now to 850,000, pending regulatory approval.

Kinder Morgan had previously said it was considering an increase to between 600,000 and 700,000 barrels per day.

Spokesman Andrew Galarnyk confirmed the $5-billion project to increase pipeline capacity would mean more outbound tankers filling up at Burnaby’s Westridge Marine Terminal.

“We’re thinking it will be somewhere between 25 and 30 per month,” he said.

Galarnyk said that estimate – up to 360 tankers per year visiting Burrard Inlet – is based on continued use of the current Aframax size tankers, not much larger Suezmax tankers, which would require dredging of the Second Narrows.

Just 32 tankers loaded at Westridge last year and the highest number ever was 69 in 2010.

The terminal itself is to be expanded to two berths under the project, and Galarnyk said the export capacity there will be revised upward, from a previously suggested 450,000 barrels per day to probably 500,000 to 550,000.

Currently, around 80,0000 barrels per day are loaded.

“This strong commercial support shows the market’s enthusiasm for expanding market access for Canadian crude by expanding an existing system,” Kinder Morgan Canada president Ian Anderson said in a statement.

The company plans 18 to 24 months of extensive public and community consultations ahead of a formal project application to the National Energy Board in 2014.

“We are still early in the engagement process of the project,” Anderson said.

“We will also consider providing financial support to local communities for environmental initiatives,” he said.

“We have been planning for this day for many years and we are keen to start in-depth engagement this summer.”

Kinder Morgan aims to begin construction in 2016 and open the new line in 2017.

The company also promises traditional land use and environmental and socio-economic studies as part of the project review.

For more on the issues surrounding the plans to increase exports of oil via tanker, see the Black Press series Oil & Water.

Just Posted

Saanich police investigating sexual assault in broad daylight

Social media lit up with accusations incident took place at Regina Park tent city

Opposing views clash over removal of Royal Oak Golf Course from ALR

Golf course not ideal for farming, says report

Swimmer halts journey across Strait of Juan de Fuca after hypothermia sets in

Susan Simmons swam for eight-and-a-half hours in 9 C choppy waters

Oak Bay man designer behind Canucks’ retro jersey

Jeremie White was 20 years old when he told Canucks assistant GM Brian Burke he had a design

Canadians fear for relatives trapped amid flooding in Indian state of Kerala

More than 800,000people have been displaced by floods and landslides

IndyCar driver Wickens flown to hospital after scary crash

IndyCar said Wickens was awake and alert as he was taken to a hospital

Ex-BCTF president ‘undeterred’ after early release from pipeline protest jail term

Susan Lambert and Order of Canada recipient Jean Swanson released early

Fast food chains look to capitalize on vegetarian, vegan trend with new items

Seven per cent of Canadians consider themselves vegetarians and 2.3 per cent identify as vegans

A taste of Greece comes to Victoria

Greek Fest runs Aug. 24 to 26 and Aug. 31 to Sept. 3 at the Greek Community Centre

‘Hard on water:’ Smoke not the only long-range effect of wildfires

The project began more than 10 years ago after southern Alberta’s 2003 Lost Creek fire

B.C. VIEWS: Genuine aboriginal rights can be misused and discredited

Camp Cloud one of long line of protests falsely asserting title

Prime Minister Justin Trudeau to march in Montreal’s Pride parade

Trudeau will end the day in his home riding of Papineau

Most Read