The steel for the new mooring dolphin extension has arrived at the Greater Victoria Harbour Authority. (File contributed/ GVHA)

Greater Victoria Harbour Authority’s second steel shipment arrives safely

The GVHA’s original shipment was lost at sea in December 2018

The Greater Victoria Harbour Authority (GVHA) is breathing a sigh of relief as the final components required for its new mooring dolphin extension arrived safely Tuesday morning.

The three-metre-wide,64-metre long large-diametre pile weighs 204 tonnes and arrived from China via the Artic Tuk after a first attempt at the shipment was lost in a catastrophic storm in Dec. 2018.

READ MORE: GVHA waits on second shipment of steel following cargo sinkage

The loss of the first shipment meant that the GVHA had to come up with alternative plans for its incoming cruise ships, most specifically for its largest visitor to date: The Royal Carribean’s Ovation of the Seas.

The steel for the new mooring dolphin extension has arrived at the Greater Victoria Harbour Authority. (File contributed/ GVHA)

For the 2019 season, the Ovation was moored at Pier A, but with more restrictions since the location wasn’t optimal for high-winds.

The piece will help construct the 58-metre mooring dolphin extension of Pier B and will allow for the safe moorage of the quantum-class sized cruise ships – those that reach around 350 metres long.

ALSO READ: Greater Victoria Harbour Authority putting $7 million into pier investments

The steel cost between $3-4 million, and the project in total will cost $6.8 million, making it the latest capital infrastructural investment in the GVHA’s history.

Construction of the dolphin extension will take place over five months and will be completed for thecoming cruise ship season, which begins on April 3, 2020.

nicole.crescenzi@vicnews.com

Like us on Facebook Send a Tweet to @NicoleCrescenzi
and follow us on Instagram

City of VictoriaCruise ShipsInner Harbour

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

PHOTOS: Small crowd gathers to watch 231-tonne stacker-reclaimer load onto barge crane

The Dynamic Beast barge crane, known for work with Johnson Street Bridge, makes a return

Saanich Peninsula Hospital Auxiliary hosts pop-up fundraiser in Sidney

Temporary store to feature unique hand made gifts, collectibles, clothing, books and more

National Drug Drop-Off month aims to reduce substance abuse by house-bound youth

Expert says there is misconception prescribed medication is safe to take

Victoria mayor wants newspaper boxes removed from downtown streets

Mayor Lisa Helps says the boxes are not needed, often filled with garbage

Esquimalt artists take to great outdoors amid coronavirus

Group invites budding, or just willing artists, to join at Saxe Point

Crews work overnight to try to put out wildfire on Pender Island

Fire department and B.C. Wildfire Service crews extinguishing fire in ‘extremely difficult terrain’

Crews work overnight to try to put out wildfire on Pender Island

Fire department and B.C. Wildfire Service crews extinguishing fire in ‘extremely difficult terrain’

Michael Buble among 13 British Columbians to receive Order of B.C.

Ceremony will be delayed to 2021 due to COVID-19

U.S. border communities feel loss of Canadian tourists, shoppers and friends

Restrictions on non-essential travel across the Canada-U.S. border have been in place since March 2`

Rollout of COVID-19 Alert app faces criticism over accessibility

App requires users to have Apple or Android phones made in the last five years, and a relatively new operating system

Alleged impaired driver sparks small wildfire near Lytton after crash: B.C. RCMP

Good Samaritans prevented the blaze from getting out of control

B.C. First Nation adopts ‘digital twinning’ software to better manage territory

Software allows users to visualize what a mountain might look like if the trees on its slopes were logged

Most Read